MA HIC #220711 · CS-123907 · Fully Insured

Bathroom Remodeler on Cape Cod

Bathroom remodeling across Cape Cod, from walk-in shower and tub-to-shower conversions to vanities and bathroom countertops, with the substrate assessment and waterproofing completed before any finish goes down.

Every project begins with a review of the existing structure, levelness, moisture, and substrate so the written estimate reflects what the room actually needs.

MA HIC #220711 · CS-123907 · Fully Insured · Free Estimates
Custom bathroom tile shower installation in West Yarmouth Cape Cod
Tile of America Built for Cape Cod
Waterproofed From the Structure Out

Substrate preparation, waterproofing, levelness, and transitions are handled before the finished tile conceals the assembly.

License

MA HIC #220711 · CS-123907

Licensed Massachusetts home improvement contractor

Protection

Fully Insured

Professional installation across Cape Cod

Location

West Yarmouth Based

Local service throughout Cape Cod and surrounding communities

Warranty

One-Year Written Warranty

Workmanship coverage provided in writing before work begins

Built for Cape Cod Homes

Bathroom remodeling starts below the tile.

Bathroom remodeling in West Yarmouth is not only a cosmetic project. An aging subfloor, daily moisture, coastal humidity, and seasonal temperature changes all affect how a finished installation performs.

Tile of America assesses movement, levelness, moisture conditions, and the existing substrate before recommending materials.

That preparation helps prevent cracked grout, hollow tile, leaks, and transitions that do not finish correctly.

Subway tile shower installation by Tile of America in West Yarmouth MA
Real Project · Cape Cod
Bathroom Preparation Built Right Before Tile

Our Services

Tile services for Cape Cod bathrooms, showers, and floors

Professional tile preparation and installation for homes throughout West Yarmouth and Cape Cod.

Bathroom Remodeling by Tile of America on Cape Cod Full Remodel

Bathroom Remodeling

Layout, waterproofing, fixtures and finishes handled as one job rather than a tile job with other trades bolted on. Scope and number in writing before anything is opened up.

$9,000 to $34,000 View service
Walk-In Shower Conversion by Tile of America on Cape Cod Conversion

Walk-In Shower Conversion

Replacing a tub or an enclosure with a walk-in shower changes the drain, the framing and the floor build-up. All three are settled on site before the quote is written.

Drain and framing first View service
Tub to Shower Conversion by Tile of America on Cape Cod Conversion

Tub to Shower Conversion

The tub comes out, the plumbing moves, and the floor is rebuilt to carry a tiled pan. The permit is pulled before the work starts because the drain is being relocated.

Permit pulled first View service
Master Bathroom Remodel by Tile of America on Cape Cod Master Bath

Master Bathroom Remodel

Larger rooms, larger formats and more natural stone, which all ask more of the substrate. Flatness is measured to the tolerance the material needs rather than estimated.

Measured flatness View service
Small Bathroom Remodeling by Tile of America on Cape Cod Small Bath

Small Bathroom Remodeling

A small bathroom is almost all corners rather than open field tile, so the membrane detailing takes longer than the square footage suggests. Priced on the room, not the area.

Detailing priced honestly View service
Bathroom Vanity Installation by Tile of America on Cape Cod Vanities

Bathroom Vanity Installation

The vanity goes in after the floor and the wall tile, scribed to what the room actually is rather than what the drawing assumed, with the plumbing reconnected and tested.

Scribed to the room View service
Bathroom Countertop Installation by Tile of America on Cape Cod Countertops

Bathroom Countertop Installation

Quartz, granite or porcelain tops for vanities, templated on site once the cabinet is level, with the undermount sink and the backsplash detailed as one piece of work.

Templated after levelling View service

Choosing the Scope

Which tile service is right for your project?

The room, structure beneath it, and expected use determine the scope. Every project receives a site visit before the estimate is finalized.

Service Best for Cape Cod considerations Pricing
Bathroom tile Primary baths, rentals, full remodels Subfloor and moisture assessment $10 to $25 per sq ft installed
Shower tile Rebuilds and wet areas Complete named waterproofing system $18 to $35 per sq ft installed
Floor tile Kitchens, entries, high-traffic rooms Deflection and finish-height check $10 to $25 per sq ft installed
Backsplash Kitchen and bath refreshes Surface preparation and clean transitions $15 to $40 per sq ft installed
Tile removal Projects with existing tile Reveals substrate and hidden conditions $3 to $8 per sq ft

Every project is quoted after an on-site assessment. Contact us to schedule.

Before Hiring a Contractor

What to look for in a bathroom tile proposal

A strong proposal should explain what happens below the finished tile — not only the material that will be visible.

Bathroom subfloor assessment before tile installation in West Yarmouth MA
Pre-Installation Assessment
01 · Structure

Deflection Assessment

Material selection should follow a review of subfloor movement and levelness.

02 · Moisture

Named Waterproofing

The written scope should identify the system and treatment of seams and transitions.

03 · Planning

Permit Clarity

Permit responsibility should be resolved before work starts.

04 · Existing Conditions

Older Flooring

Pre-1980 flooring should be identified before removal begins.

Coastal Conditions

Does Cape Cod's coastal climate make waterproofing more critical in a bathroom remodel?

Cape Cod's salt air, rainfall, seasonal occupancy, and freeze-thaw cycles put added pressure on wet-area assemblies. The waterproofing system should be named—not implied—in the written scope.

Seams, penetrations, niches, and floor-to-wall transitions need a continuous installation consistent with the selected system.

These details are completed and checked before the tile conceals them.

Bathroom shower tile installation by Tile of America in West Yarmouth MA
Wet-Area Preparation
Coastal Conditions Waterproofed Before Tile
Floor installation preparation by Tile of America in West Yarmouth MA
Substrate Assessment
Failure Prevention Preparation Determines Performance

Preparation Determines Performance

Why do most tile failures in Cape Cod homes happen before the first tile is set?

Cracked grout, loose tile, and leaks frequently begin with a substrate that moves, carries moisture, or was not properly prepared. Those conditions exist before installation starts.

A site review identifies movement, moisture, deteriorated panels, and older materials so the installation can be designed for the room that actually exists.

Our Process

How we work: from site visit to finished tile, anywhere on Cape Cod

Every project starts with the existing conditions. The substrate, moisture, levelness, scope, and waterproofing requirements are reviewed before the finished tile work begins.

White subway tile shower installation by Tile of America in West Yarmouth MA
From Assessment to Finish
01 · Review

Consultation

Marco Aurélio reviews the room, substrate, moisture, levelness, and existing materials.

02 · Scope

Estimate

A written estimate explains scope, preparation, waterproofing, materials, and timeline.

03 · Build

Installation

Preparation comes first, followed by waterproofing, setting, grouting, and transitions.

04 · Review

Final Inspection

The finished work is reviewed with you before the project is closed.

Scope Determines the Requirement

Do I need a building permit for a bathroom remodel on Cape Cod?

Permit requirements depend on the work involved. Replacing tile over an intact substrate may be treated differently from a project that opens walls, relocates plumbing, or changes structural components.

The Yarmouth Building Department makes the scope-specific determination. Permit responsibility is reviewed before the project is finalized so it is not discovered after installation begins.

Bathroom remodel permit and project planning in West Yarmouth Massachusetts
Project Planning
Permit Review Scope First. Requirements Second.
Finished bathroom tile covered by Tile of America workmanship warranty
Written Workmanship Protection
Tile of America Warranty One Year, Provided in Writing

One-Year Written Protection

Tile of America's one-year written warranty: what it covers and what it does not

The written warranty covers workmanship indicators including water leaks in wet areas, tile that comes loose or sounds hollow, and grout that cracks or separates.

Workmanship

Covered

  • Water leaks in wet areas
  • Loose or hollow tile
  • Cracked or separating grout
Exclusions

Not covered

  • Cleaning-product discoloration
  • Structural movement or work by others
  • Impact damage and normal sealant maintenance

Based in West Yarmouth

Bathroom tile contractor serving all of Cape Cod

Tile of America is based at 15 Adams Rd in West Yarmouth . Regular work reaches Hyannis, Dennis, Falmouth, Brewster, Harwich, Chatham, Orleans, Eastham, Sandwich, Bourne, Mashpee, Wellfleet, Truro, and Provincetown when the project fits the schedule.

Call (774) 368-6838 to confirm availability for your address.

Tile of America service area map in Cape Cod Massachusetts
Cape Cod Service Area
West Yarmouth Based Serving Homes Across Cape Cod

Frequently Asked Questions

Questions about bathroom remodeling on Cape Cod

Clear answers about waterproofing, preparation, permits, workmanship, and warranty coverage for bathroom tile projects across Cape Cod.

What tile services does Tile of America offer for bathroom remodels?

Tile of America installs bathroom tile, shower tile, floor tile, kitchen tile, and backsplash, and handles full tile removal when a project requires it. Every service begins with a structural assessment before a single tile is set, because subfloor condition and substrate quality determine whether the finished work holds. Contact Tile of America for a free estimate on your Cape Cod project.

What makes your shower waterproofing different from other tile contractors?

Tile of America builds every shower on the Schluter Kerdi system using Kerdi-Board panels, which are waterproof through the board itself rather than relying on surface coatings. A liquid membrane goes underneath the Kerdi system as a second independent layer, one more than the manufacturer requires. Since opening in 2022, Tile of America has never been called back for a shower leak.

What warranty covers a bathroom tile installation from Tile of America?

Tile of America provides a one-year written warranty on every installation, delivered in writing before work begins. It covers water leaks in showers and wet areas, tile that comes loose or goes hollow, and grout that cracks or separates. It does not cover discoloration from cleaning products, damage from structural movement, chips from impact, or normal wear on caulk and sealant lines.

Why does the subfloor inspection happen before Tile of America gives a quote?

Accurate pricing for a bathroom tile installation depends on what is underneath the floor, not just what is on top of it. Tile of America checks whether the floor is out of level, whether the framing has any bellies, and what self-leveling the subfloor actually needs before quoting. The finish height is also set so new tile lands flush with adjacent flooring, avoiding threshold strips the homeowner never asked for.

Does a home in a local historic district need extra review before a bathroom remodel?

West Yarmouth's Yarmouth Camp Ground Historic District, a National Register area off Willow Street, is a demolition-review district rather than a full architectural-review district. Tile of America works within the district, but homeowners whose properties involve any demolition should confirm with the Yarmouth Historical Commission before work begins, since the Commission reviews and approves demolition of structures within the district's boundaries.

How does Cape Cod's housing stock affect what a bathroom remodel requires?

Many homes in West Yarmouth were built between 1940 and 1999, and structures of that age frequently have subfloor conditions, framing irregularities, or substrate materials that must be assessed before tile work begins. Tile of America inspects the structure before quoting every job precisely because aging construction on Cape Cod makes pre-installation evaluation the most important step in a lasting bathroom remodel.

Which towns on Cape Cod does Tile of America serve for bathroom remodeling?

Tile of America serves the full Cape Cod region from its base in West Yarmouth, including Yarmouth, Hyannis, Dennis, Harwich, Brewster, Chatham, Orleans, Eastham, Wellfleet, Truro, Provincetown, Falmouth, Mashpee, Bourne, and Sandwich, as well as Plymouth and Sagamore to the north. Contact Tile of America to request a free estimate for your property anywhere in the service area.

Is a contractor's license required for tile work on Cape Cod, and does Tile of America hold one?

Massachusetts requires a Home Improvement Contractor registration for remodeling work on residential properties. Tile of America holds MA HIC number 220711, issued to owner Marco Aurelio. Homeowners on Cape Cod can verify contractor registrations through the state before signing any contract, which is a straightforward step that protects against unregistered operators.

Tile of America · West Yarmouth

Ready to discuss your bathroom project?

If you are still working out the scope, a site visit is the right place to start. Tile of America reviews the room, explains what the project needs, and provides a written estimate based on the actual conditions.